Workers for the 1-20 Ranger Hill Project are nearly done with the retaining walls (left) on the north frontage road. Riprap, which helps prevent erosion, was placed along overpasses (center). Flexbase was placed along parts of the north frontage road (right). Flexbase helps preserve the lifespan of the roadway. TxDOT Photos
Thu, 11/25/2021 - 12:00am